Along with our broad range of
commercial concrete services including pumping, shotcrete, rebar fabrication
and installation, trucking, and design/build, The Conco Companies also offer
superior formwork. This all-important
temporary structure is designed to contain and mold poured concrete until it
hardens into the required shape.
Showing posts with label concrete forms. Show all posts
Showing posts with label concrete forms. Show all posts
Sunday, April 30, 2017
Sunday, September 28, 2014
How Do Articulating Booms Enhance Maneuverability?
The
ultimate advancement in moving concrete has been the concrete pump. The Conco Companies own an impressive number
of different size pumps that gives us the opportunity to use the very best
equipment available in the industry to meet the specifics of each job.
As
the saying goes that you need to use the right tool for the right job so is it goes
for concrete pumps. Many jobs could not
be done without the boom pumps that can reach up to 184 feet horizontally to
place concrete on to the upper floors of today’s super tall skyscrapers but
just as important to the industry are articulating boom pumps.
Articulating
booms known as roll-and-fold or Z-fold come in four-section multi-Z booms or five-section
Z-Fold booms and offer a lot of versatility and a great working range. These booms can maneuver around obstacles and
be used to reach difficult places but still provide a good vertical reach (the exact
amounts depends on the model). Another
advantage to articulating booms is even though they offer a long reach they are
able to fold up to a much smaller size when transporting.
One
example of an articulating boom is the Putzmeister 28Z. Conco thinks it is such an important addition
to our booms that we have one in all of our pumping locations including the Seattle area. The pump
offers a smooth concrete flow while having the smallest front outrigger
footprint of all models in its class. Since
the 28Z does not require a large vertical clearance to unfold, it can unfold
inside of a building when a job calls for it.
The smaller size means it travels easily and can be set up quickly.
These
lighter and very resilient pumps can adapt to different loads and now feature longer
straight pipe for a less stressful concrete flow and better wear on parts. The multi-Z configuration can pump even if
the boom is not fully extended and “their elbow-like joints, controlled
independently by hydraulic cylinders, often allow the operator to place
concrete at any point between the truck and the boom’s maximum horizontal and
vertical reach.”
Sources:
The
Conco Companies has built a reputation in the Los Angeles area with superior
concrete formwork, reinforcing, place and finish, shotcrete and other ancillary
services that benefit from our vast experience.
We have been offering premium concrete services throughout the Western
U.S. since 1959, and have four regional offices serving California, Washington, Oregon, Nevada and Colorado.
Saturday, September 27, 2014
What Goes Into Determining the Best Pump to Use?
As
we discussed in a previous blog post, the Conco Companies have owned and
operated one of the largest pumping companies in the Western United States for
over 40 years. Our overwhelming success
and continued expansion has put us in a leadership role in the commercial
concrete industry. We have an impressive fleet of concrete pumps
with eleven of them conveniently based out of Washington State to handle the needs of our customers in this
area.
So
what are the actual criteria that we take into account when determining which
concrete pumps to use on a particular job?
One of the first things we need to know is the concrete output required
to get the job done and the delivery output needed in cubic yards per hour that
will meet the specifications of the job.
Having this information, now the engineer knows the pumping volume that
the boom truck must deliver to accomplish the task. The cubic yard per hour output for each boom
truck is provided by the manufacturer as well as other features and
capabilities of each pump.
Next
the layout of the pumps at the jobsite needs to be figured out and how long of
a boom will be required to reach all of the work areas. A boom’s maximum reach is really 10 to 20
feet shorter as the boom travels horizontally as well as vertically (the reach
is not directly straight out or straight up).
Furthermore properties of the concrete mix such as the type of aggregate
or sand used have to be evaluated as some concrete designs require more
pressure to pump.
Other
factors taken into account are conditions at the jobsite including the size, any
overhead obstacles, amount of congestion on the site, and any obstacles along
the sides of the area. Also how much
room is there to get concrete trucks on and off the site? These are but a sampling of the many dynamics
that experienced concrete contractors use to determine the size of the pumps
and how many to use.
Sources:
Conco
is a leading supplier of concrete services for the Western United States. We
got our start in the Bay Area in 1959 by offering clients the best value on a
wide range of concrete services and products.
Since that time, we have taken a leading role as one of the top concrete
contractors in the region. We have four regional offices serving California, Washington, Oregon, Nevada and Colorado.
Friday, April 4, 2014
Using Tower Cranes to Build Skyscrapers
In order to build the super tall
skyscrapers of today such as the Wilshire Grand Center in Los Angeles, huge
tower cranes are used. Tower cranes are capable
of lifting very heavy loads of steel, concrete, generators and other building
materials and can be erected to grow taller as the construction project moves
upward.
Before a tower crane is ready to use,
it needs to be stabilized at the jobsite.
The process entails building a concrete pad with large anchor bolts embedded
into the concrete that secures the base of the crane. Once a tower crane reaches its maximum height,
it can be tied to the side of the structure with steel collars and moved upward
as a project demands.
The gears and motor for the crane are
contained in the slewing unit that is attached to the mast and which allows the
crane to rotate. On top of that is the
long jib that is used to lift the heavy materials as well as the counter-jib
that works as a counter-weight to keep the crane balanced. The crane operator may control the unit from
the ground or in a cab that is on top of the tower.
The tower crane mast is a steel
triangular lattice structure that is constructed of vertebras generally 10
square feet in size. Once a crane has
been fastened to the exterior of the building or in some cases to the interior
and needs to be raised higher, the process is started to add new pieces. A climbing frame or metal sheath that sits between
the slewing unit and the top of the tower is used to temporarily support that
section of the mast while the jib moves a new segment into the space. Once the new piece is bolted down, the
climbing tower then moves higher up along the mast ready
for the process to begin again.
According to Wikipedia, typically the
maximum unsupported height of a tower crane is 265 feet and the maximum reach of
the jib is 230 feet. It has a maximum
lifting strength of 19.8 tons.
Conco’s team of professional
concrete contractors in the Portland area brings the highest level of
integrity and principles to each project from pre-construction to finish. With the rapidly growing construction market,
Conco is taking an active role in the Portland area with our expansion of
high-quality commercial concrete services.
Saturday, January 18, 2014
Subscribe to:
Posts (Atom)