Since June 2016, The Conco Companies have been
supplying concrete services for The Mark at 5th & Columbia
project. As a reminder, the project consists of a 528,000 sqft office space,
hotel, and spa scheduled to be completed by April 2017. The building boasts a
number of green building features and hopes to seek LEED Gold certification.
The initial concrete mat foundation pour, completed in June 2015, required 500
truckloads of concrete alone.
The project is progressing beautifully. As of August
2016, the concrete core stood at its final height (48 stories) and the focus
shifted to completing the remaining concrete pours for the structural decks and
garages. Remaining concrete pours for the month of August commenced at a pace
of 2 per week until Level 28 was reached. Structural steel was installed in August and
roof steel was installed shortly after, bringing an end to the steel erection
process.
The project really ramped up in September when concrete
pours were increased from 2 per week to 3 per week with the goal of completing
all concrete decks up to level 4. This pace continued through October until
level 45 concrete cement decks had been successfully poured.
Parts of the garage, which have been poured, are being
polished with final paint and signage. The next major
project milestones include the rooftop mechanical and structural
assemblies, podium construction for levels 1 through 5, mid and high-rise
elevators, and the removal of cranes as the project moves onward.
Conco is a
leading supplier of concrete services for the Western U.S. and we got our start
in the Bay Area in 1959 by offering clients the best value on a wide range of
concrete services and products. Since
that time, we have taken a leading role as one of the top concrete contractors
in the region. Our offices serve California, Colorado, Oregon, Washington and
Nevada.
No comments:
Post a Comment